“A” Level Renovation Update (6)

ges-521.jpg

Portal installation to the entry into the CRIS office space. A portal and new doors will be installed for the entry to Special Collections, and it will be similar to the Reading Room portal on the first floor.

ges-488.jpg

Librarian’s office with view out to outside.

ges-487.jpg

Workstations for support staff.

ges-486.jpg

One of two conference rooms available for consultation within the new staff office area.

ges-490.jpg

Staff workroom and receiving area.

ges-453.jpg

Work proceeds in finishing the ceiling in the reading room. Ceiling tiles go in next and then the floor coverings. We are progressing on schedule for a fall opening of the space.

One Response to ““A” Level Renovation Update (6)”

  1. Jonathan says:

    It looks great! I especially like the glass-walled conference room. I always enjoyed studying in those as a student at the UofA, we referred to them as fishbowls.