A-level Flooring Installation Scheduled

The cork flooring on the Research Library A level is scheduled to be installed this week. The prep work should begin on Wednesday, with the cork being installed on Thursday and Friday.

All collections, services, and facilities on the A level will remain accessible throughout, though access routes to them may temporarily change as necessary.

Leave a Reply