Archive for April, 2010

Tunnel Built in Lobby

Monday, April 5th, 2010

Construction has started on a “tunnel” through the lobby, which will shield visitors from construction taking place throughout the first floor.  The passage will run from inside the front doors to near the current location of the circulation desk.  First-floor access to the central stairwell and the east bank of elevators will remain unchanged.